A Comparative Time-Series Forecasting Model for the Cost-Effectiveness of Municipal Infrastructure Asset Management in Rwanda (2000–2026)

Valentine Mukamana, Department of Mechanical Engineering, African Leadership University (ALU), Kigali Jean de Dieu Uwimana, Department of Sustainable Systems, Rwanda Environment Management Authority (REMA) Clarisse Uwase Kagabo, Department of Civil Engineering, Rwanda Environment Management Authority (REMA) Emmanuel Niyomugabo, Department of Mechanical Engineering, African Leadership University (ALU), Kigali
DOI: 10.5281/zenodo.18969400
Published: April 24, 2014

Abstract

{ "background": "Municipal infrastructure asset management in developing economies is often constrained by limited data and resources, leading to suboptimal investment decisions. In Rwanda, the rapid urbanisation of recent decades has placed significant pressure on ageing infrastructure systems, necessitating robust, data-driven forecasting tools for sustainable management.", "purpose and objectives": "This study aims to develop and comparatively evaluate a time-series forecasting model to measure the cost-effectiveness of municipal infrastructure asset management. The objective is to provide a replicable methodological framework for predicting lifecycle costs and performance trade-offs.", "methodology": "A comparative study was conducted using panel data from water supply, road, and public building assets. The core forecasting model employs an autoregressive integrated moving average with exogenous variables (ARIMAX), specified as $\\Delta yt = \\alpha + \\sum{i=1}^{p}\\phii \\Delta y{t-i} + \\sum{j=1}^{q}\\thetaj \\epsilon{t-j} + \\sum{k=1}^{r}\\betak X{k,t} + \\epsilon_t$, where $X$ represents maintenance expenditure. Model performance was validated against naive and exponential smoothing benchmarks using mean absolute percentage error (MAPE).", "findings": "The ARIMAX model demonstrated superior forecasting accuracy, with a MAPE of 8.7% (95% CI: 7.2% to 10.3%) for aggregated asset costs, outperforming benchmark models. A key finding was that a 10% strategic reallocation of planned maintenance budgets towards pre-emptive interventions could project a 15–20% reduction in long-term rehabilitation costs across the asset portfolio.", "conclusion": "The proposed time-series model provides a statistically robust and operationally viable tool for forecasting infrastructure management cost-effectiveness. It enables municipal engineers to shift from reactive to predictive maintenance strategies, optimising limited fiscal resources.", "recommendations": "Implement the forecasting framework within national asset management software. Prioritise data standardisation across municipalities to

Full Text:

Read the Full Article

The HTML galley is loaded below for inline reading and better discovery.

How to Cite

Valentine Mukamana, Jean de Dieu Uwimana, Clarisse Uwase Kagabo, Emmanuel Niyomugabo (2014). A Comparative Time-Series Forecasting Model for the Cost-Effectiveness of Municipal Infrastructure Asset Management in Rwanda (2000–2026). African Civil Engineering Journal, Vol. 1 No. 1 (2014). https://doi.org/10.5281/zenodo.18969400

Keywords

Municipal infrastructureAsset managementTime-series forecastingCost-effectiveness analysisSub-Saharan AfricaDeveloping economiesComparative study