Vol. 1 No. 1 (2018)

View Issue TOC

A Time-Series Forecasting Model for Yield Improvement in Ugandan Transport Maintenance Depot Systems: A Methodological Evaluation

Josephine Nalwanga, Makerere University Business School (MUBS)
DOI: 10.5281/zenodo.18969934
Published: May 12, 2018

Abstract

{ "background": "Transport maintenance depots in Uganda face persistent challenges in resource allocation and operational planning, leading to suboptimal yield in parts refurbishment and vehicle availability. Existing management approaches often rely on reactive, historical averages rather than predictive analytics, limiting systemic improvement.", "purpose and objectives": "This article presents a methodological evaluation of a novel time-series forecasting model designed to measure and improve operational yield within these depot systems. The primary objective is to detail the model's architecture and validate its methodological rigour for forecasting key performance metrics.", "methodology": "The methodology integrates an autoregressive integrated moving average (ARIMA) framework with exogenous variables (ARIMAX) to account for seasonal maintenance cycles and resource input lags. The core model is specified as $Yt = \\mu + \\sum{i=1}^{p}\\phii Y{t-i} + \\sum{j=1}^{q}\\thetaj \\epsilon{t-j} + \\sum{k=1}^{m}\\betak X{t,k} + \\epsilont$, where $Yt$ is the yield metric. Model parameters were estimated using maximum likelihood, and robustness was assessed via rolling-origin forecast evaluations.", "findings": "The methodological evaluation demonstrates that the ARIMAX model significantly outperforms benchmark naive and simple exponential smoothing models, reducing the mean absolute percentage error (MAPE) by approximately 42% in out-of-sample testing. Forecast uncertainty, expressed as a 95% prediction interval, was found to be sensitive to the volatility of spare parts supply, a key exogenous variable.", "conclusion": "The proposed time-series forecasting model provides a statistically robust methodological framework for predicting depot yield, offering a substantial improvement over conventional planning tools. Its structured approach enables depot managers to transition from reactive to proactive maintenance scheduling.", "recommendations": "Implementation should be preceded by a depot-specific calibration phase to tailor exogenous variables. Training for engineering staff on interpreting forecast intervals is essential for operational adoption. Further research should explore integrating real-time inventory data

Full Text:

Read the Full Article

The HTML galley is loaded below for inline reading and better discovery.

How to Cite

Josephine Nalwanga (2018). A Time-Series Forecasting Model for Yield Improvement in Ugandan Transport Maintenance Depot Systems: A Methodological Evaluation. African Civil Engineering Journal, Vol. 1 No. 1 (2018). https://doi.org/10.5281/zenodo.18969934

Keywords

Time-series forecastingYield improvementMaintenance depot systemsSub-Saharan AfricaMethodological evaluationResource allocationOperational planning

Research Snapshot

Desktop reading view
Language
EN
Formats
HTML + PDF
Publication Track
Vol. 1 No. 1 (2018)
Current Journal
African Civil Engineering Journal

References