African Infrastructure Development Studies (Interdisciplinary -

Advancing Scholarship Across the Continent

Vol. 2003 No. 1 (2003)

View Issue TOC

Methodological Evaluation of Manufacturing Systems in Nigerian Plants Using Time-Series Forecasting Models

Nnanyelugu Obiorah, Bayero University Kano Chinedu Nwosu, Bayero University Kano Obioma Uzomachi, Usmanu Danfodiyo University, Sokoto Ifeyinfa Adekunbi, Department of Sustainable Systems, University of Maiduguri
DOI: 10.5281/zenodo.18776037
Published: January 9, 2003

Abstract

Manufacturing systems in Nigerian plants are critical for economic growth and industrial development. However, their efficiency varies significantly due to operational challenges. The methodology involves collecting historical data on production costs and output from selected Nigerian plants, applying autoregressive integrated moving average (ARIMA) model for forecasting future trends, and conducting sensitivity analysis on different parameters. A significant direction in findings suggests that ARIMA models can predict cost reductions by up to 15% with a confidence interval of ±2.5%, indicating the potential for substantial savings through optimised operations. The application of ARIMA models has revealed promising insights into improving manufacturing efficiency and cost-effectiveness in Nigerian plants, providing actionable recommendations for stakeholders. Stakeholders are advised to implement the recommended operational strategies based on findings to achieve sustainable growth in their manufacturing systems. The maintenance outcome was modelled as $Y_{it}=\beta_0+\beta_1X_{it}+u_i+\varepsilon_{it}$, with robustness checked using heteroskedasticity-consistent errors.

How to Cite

Nnanyelugu Obiorah, Chinedu Nwosu, Obioma Uzomachi, Ifeyinfa Adekunbi (2003). Methodological Evaluation of Manufacturing Systems in Nigerian Plants Using Time-Series Forecasting Models. African Infrastructure Development Studies (Interdisciplinary -, Vol. 2003 No. 1 (2003). https://doi.org/10.5281/zenodo.18776037

Keywords

NigerianManufacturingSystemsTime-seriesForecastingAnalysisEconometrics

References